Skip to Content
Byte Sized Engineering
shop
projects
About
0
0
Byte Sized Engineering
shop
projects
About
0
0
shop
projects
About

shop

  • All |
  • Digital Downloads |
  • Merch |

Filters

Digital Build Guide - Openwheel
Digital Build Guide - Openwheel
$32.00
Digital Plans - Bartop Arcade
Digital Plans - Bartop Arcade
$32.00
Digital Plans - Two Seat Porch Swing
Digital Plans - Two Seat Porch Swing
$8.00
Digital Plans - Single Seat Porch Swing
Digital Plans - Single Seat Porch Swing
$8.00
Digital Plans - Planter Box
Digital Plans - Planter Box
$8.00
Digital Template - Spool Rack
$4.00
Design Files - Diresta Razor Blade Utility Knife
Design Files - Diresta Razor Blade Utility Knife
$4.00
helping hands - byte sized engineering
helping hands - byte sized engineering
$32.00
Toddler Short Sleeve Tee - byte sized engineering
$16.00
Unleash Your Inner Maker - Byte Sized Engineering
$32.00
555 Timer T-Shirt (Component Series)
555 Timer T-Shirt (Component Series)
$32.00
MOSFET T-Shirt (Component Series)
MOSFET T-Shirt (Component Series)
$32.00
LED T-Shirt (Component Series)
LED T-Shirt (Component Series)
$32.00
Star Wars Scomp Link USB Port - Fusion 360 CAD Design Files
Star Wars Scomp Link USB Port - Fusion 360 CAD Design Files
$16.00
CO2 Laser Cutter - Fusion 360 Design and STEP Files
CO2 Laser Cutter - Fusion 360 Design and STEP Files
$16.00

No results found

No results match your search. Try removing a few filters.

Newsletter Block
This newsletter signup form needs a storage option. Edit the block and enter a storage location via the Storage tab.

Subscribe to my newsletter

Keep up to date with new online courses, live workshops, and whatever else I’m working on!

I will never sell or misuse your information

Thank you!